Other Projects
T2 Bus Lane Bollards
Perth Airport, WA, 2017, West Coast Civil
Scope included the earthworks and installation of ram proof security bollards.
Mercury Treatment Facility
Karratha, WA, 2017 Pindan Contracting
Scope included detailed earthworks, the forming and pouring of retaining walks and the forming and pouring of two heavy duty industrial slab including washdown slabs.
Bow River Bridge
South Kununurra, WA, 2018 BMD Constructions
Scope included the forming and pouring of 22 in-situ concrete piers and the forming and pour of a two lane bridge deck (250m).
Onslow Multipurpose Courts
Onslow WA, 2018, Pindan Contracting
Scoped included detailed earthworks and associated drainage, the forming and pouring of footings, slabs, and acoustic walls.
Port Hedland Airport
Port Hedland, WA, BMD Constructions
Scoped included the forming and pouring of an apron slab, drainage and culvert installation along live aprons.
Smart Freeways
Perth, WA, 2020 BMD Construction
Scope included the excavation & installation of drainage pipes, pits and concrete footings along 7km of the Kwinana freeway.
Pier Protection Walls
Perth, WA, 2021 Tonkin Gap Alliance
Scope included the forming and pouring of seven in-situ concrete pier protection walls totaling 1520 cubes of concrete and 132 tons of steel.